Product Report of the Month

Patching Peabody’s Façade

When replacement stone was unavailable for the façade restoration of the Peabody Conservatory, Quinn Evans | Architects opted for patching mortars, with fine results.

By Hadiya Strasberg

Click Here for a List of Masonry Restoration Specialists
Click Here for a List of Facade Restoration Specialists

The Peabody Conservatory of the John Hopkins University was one of the first academies of music to be established in the United States. Located in Baltimore, MD, the Italianate building was designed by Edmund Lind and constructed in two parts in 1866 and 1878. (The first part was the 600-seat Miriam A. Friedberg Concert Hall and The George Peabody Library was the second.)

In the summer of 2001, Quinn Evans | Architects (QEA) of Washington, DC, undertook a $26.8 million renovation to integrate and revitalize the Peabody campus. The program included the enhancement of facilities and the creation of new rehearsal and performance halls, studios, practice rooms and administrative space. One of the most important aspects of the project was the cleaning and patching of select areas of the white marble façade of the Conservatory.


The Peabody Conservatory of the John Hopkins University, as portrayed in the 1930s, was designed by architect Edmund Lind. The Italianate building in Baltimore, MD, was built in two parts in 1866 and 1878 of local white marble. All photos: Quinn Evans | Architects

The condition of the building before restoration was poor: The north façade was covered with layers of urban dirt and deep staining caused by water, minerals and paint. The columns, especially the column bases, were in similar condition to the façade and surface spalling associated from freeze/thaw cycling and de-icing salts was found around the stairs. Because surface erosion was also an issue, it was not possible to determine the original finish. A cast-iron canopy, a 1917 addition to the entrance to Friedberg Concert Hall, was in very poor condition and was removed as part of the renovation project. This left iron stains, holes and damage resulting from the removal process.

Fortunately, QEA was able to review the original documentation of the building, including drawings, construction correspondence and annual reports. “This helped immensely,” says Baird M. Smith, AIA, FAPT, of QEA. “We were able to identify that the marble came from local Maryland quarries [i.e., Beaver Dam, Cockeysville and Texas – about 75 miles from the building].” However, these quarries had gone out of business in the middle of the 20th-century. “We attempted to find a match at the remaining three or four quarries nearby, and from other sources in Georgia and Vermont, but the differences in the marble were too great,” says Smith.

“The next route we took was recovering some stone from a hidden location on the side of the building.” Smith points out, however, that the stone was unusable, because it was not a good match. QEA concluded that Dutchman repairs wouldn’t work, because the only obtainable stone had gray veins and other dark striations and a horizontal pattern that did not match the original marble. “The original stone was a pure white, with light gray veining,” says Smith. “When considering patches one must look closely, because the marble is often unique for color, veins and color striations.”


The north façade of the Peabody was covered with urban dirt and water and mineral stains before Washington, DC-based Quinn Evans | Architects (QEA) restored it. The cast-iron canopy in front of the original arched opening was removed as soon as construction began in October 2003. The iron deposits that were left in its place, along with the other discolorations on the marble façade, were cleaned as best possible.

Given that the original marble was unobtainable and that shaping and carving replacement stone was difficult, QEA choose to use a patching compound. “We went with Cathedral Stone Products,” Smith says, “because our contractor had worked with the company’s mortars before and gotten good results.” The Hanover, MD-based company manufactures custom patching mortars for all types of stone. It offers products designed to last at least 50 years, with a long warranty. The mortars don’t contain bonding agents, latex or acrylic latex, and so are water and salt breathable. Also, the mortars can be custom tweaked to address specific problems, e.g. cracking due to excess salt content.

In order to purchase mortars from Cathedral Stone, one must attend a three-day, hands-on training program taught by masons. “The application of our mortars requires traditional masonry skills,” explains President of Cathedral Stone Dennis Rude. “The workers on-site need to be able to recognize specific issues that may arise on their particular project with this particular material.” Laura Oliphant, an historic restoration specialist certified by Cathedral Stone, was sub-contracted to make the Jahn mortar on-site and oversee its application.


A column base from Peabody’s north façade exhibits the urban dirt, deep staining, cracks and previous repairs that needed attention.

Oliphant customized Cathedral Stone’s base mortar for marble, Jahn M120, a cementitious, mineral-based mortar. She prepared seven test samples and a dry mix that attempted to match the appearance of the white marble. As with all samples, each one took three to six days to formulate and was assigned a unique number; all samples are retained for one year. However, “not one of these first patches was a good match,” Smith says, “because the color was off each time.” QEA had three final samples prepared, all of which were very good color matches and had good shapes and contours.

In preparation of the application of the Jahn mortar, the site was cleaned of all dirt, dust and foreign substrates to ensure proper adhesion. The masonry contractor, Todd Anderson of Baltimore, MD-based Worcester Eisenbrandt used the mortar for all patches, ranging from ¼-in.-deep by 2 or 3 in. to as large as 24 in. across the face by 2 to 6 in. deep by nearly 6 ft. long.


In QEA’s search for the best color, veining and texture match to the white marble, the firm tried samples of Jahn mortar, a cementitious, mineral-based patching compound from Hanover, MD-based Cathedral Stone Products. This column base was patched with a custom-colored Jahn mortar, designation #23158-M-3.

The dry patching material was mixed with water [approximately 4½ parts powder to one part water by volume] until the mixture was easy to spread. “You need to work through this process slowly,” Anderson explains,” because the water affects not only the consistency but also the color if you add too much.” Worcester Eisenbrandt was working in the late fall and early winter so the mix remained workable for four to six hours, long enough to make long or deep patches. “We repaired the majority of the holes in cool weather, but it never got below freezing,” says Anderson. “It could have an impact on the mortar and its adhesion, but, in the unlikely event it will, not a large one.”

The area that needed the greatest attention was the entry where the cast-iron canopy had been removed. “It was very important, because it’s at the front door,” explains Smith. “We wanted this patch to be as invisible as possible.” The stone in this area had very little graining and was very white, except for the streaks of iron and water stains. After the Jahn patch had been placed, it was then “tinted” by the artisan. The entire façade could not be cleaned due to budgetary restrictions, but the stone around the entry was given priority and cleaned as well as possible.


Cleaning was carried out at the front entry, in the area where the cast-iron canopy had once stood, but was only partially successful.

To obtain the texture that had resulted from many years of weathering, ground marble dust was sprinkled onto the placed mortar patches. “This imparted texture and light reflectance,” Smith says. Another practice in matching the patches to the weathered and, in some cases, still-stained stone is to paint tints onto the Jahn. “Sound preservation philosophy indicates that patches should match the color and texture of the original stone and not of the weathered stone,” Smith says. “But since the entire façade could not be cleaned, we ultimately decided to match the repairs to the staining left on the adjacent stones.” Silin-brand silicon-based masonry paint was used to blend the new work so the appearance could be as seamless as possible.


After patching the damaged stone with the Jahn mortar, the masonry contractor, Worcester Eisenbrandt of Baltimore, MD, painted tints to match the stains that remained on the original stone. The firm used Silin-brand color-fast pigments, creating a cohesive façade.

The renovation and additions to Peabody Conservatory were completed March 2004. That same month, QEA finished work on the marble façade, creating a cohesive façade that is cleaner and uniform in color, veining, staining and texture. “Everyone is extremely pleased with the stone repairs and cleaning,” says Smith. “In fact, most people cannot identify the patches – they remain nearly invisible.”

~~~

Fewer areas of building restoration are more complex, or more prone to ill-advised ad-hoc procedures, than the treatment of brick and stone surfaces. For buildings of any significant value, the first step in any major masonry restoration project should be engaging the services of a qualified architectural conservator who has no vested interest in selling any particular product or contracting service. Several firms experienced in providing consulting services on historic masonry can be found by clicking here; additional names can be obtained through our TradWeb Directory of Custom Building and Restoration Services

The firms compiled by our Editors fall into 8 major categories: (1) Masonry Patching & Adhesive Materials; (2) Paint Stripping & Cleaning Chemicals; (3) Waterproofing Materials & Sealants; (4) Coloring Systems for Masonry and Mortar; (5) Historic Mortar Materials; (6) Masonry Repair & Waterproofing Contracting & Consulting Services; (7) Replacement Elements; (8) Masonry Anchoring Systems. As we said, it's a complex area!

Each issue of TRADITIONAL BUILDING contains 15 or more such reports covering products and services used in restoration, renovation, and historically styled new construction. If you would like to subscribe, please visit our subscription page.

Click here for Previous Product Reports


Free Product Literature
Previous Product Reports
Articles Online

 
Back to top

www.Traditional-Building.com
Home | Search Suppliers| Resources | Subscriptions | Advertising
About Us
| SiteMap | Contact Us

Copyright 2008 Restore Media LLC. All Rights Reserved.